ACOUSTIC

PROJECTS

OTHERS

Department of Occupational Safety and Health (DOSH) Projects

NO PROJECT CLIENT SCOPE OF WORK STATUS /COST

1.

Boral Plasterboard (Malaysia) Sdn. Bhd. manufacturing facility in Parit Buntar Industrial Estate, Perak.

Boral Plasterboard (Malaysia) Sdn. Bhd.

Initial Noise Monitoring for the purpose of submission to JabatanKeselamatandanKesihatanPekerja, Malaysia, as required under the Factories and Machinery (Noise Exposure) Regulations, 1989.

Noise measurements include noise contour mapping, dosimeter reading from relevant factory workers exposed to excessive noise, identifying the action level (85dBA) and providing noise control measures where necessary.

Completed

2.

Columbia Chrome Malaysia.   A member of Tractors Malaysia Group.

Tractors Malaysia.

Completed

3.

CS Seiko Sdn Bhd, Meru, Klang.

CS Seiko Sdn Bhd.

Completed

4.

Poly Carries Industries (M) Sdn. Bhd., Taman Sentosa, Klang.

Poly Carries Industries (M) Sdn. Bhd.

Completed

5.

Suzuki Latex Industry Malaysia Sdn. Bhd., Shah Alam, Selangor.

Suzuki Latex Industry Malaysia Sdn. Bhd.

Completed

6.

Dara Lam Soon Oil Mill, Muadzam Shah, Pahang DarulMakmur.

Dara Lam Soon Oil Mill.

Positive Noise Monitoring for the purpose of submission to JabatanKeselamatandanKesihatanPekerja, Malaysia, as required under the Factories and Machinery (Noise Exposure) Regulations, 1989, Regulation No. 10.

Noise measurements to be conducted subsequent to the Initial Noise Monitoring showing the measured noise exceeding or in-excessive of the action level 85dBA.

Completed

7.

Pan Merchant Industries Sdn. Bhd. (PMI).

Pan Merchant Industries Sdn. Bhd. (PMI).

Initial Noise Monitoring for the purpose of submission to JabatanKeselamatandanKesihatanPekerja, Malaysia, as required under the Factories and Machinery (Noise Exposure) Regulations, 1989.

Noise measurements include noise contour mapping, dosimeter reading from relevant factory workers exposed to excessive noise, identifying the action level (85dBA) and providing noise control measures where necessary.

Completed

8.

DOSH Employee Hearing Conservation Training.

Suzuki Latex Industry Malaysia Sdn .Bhd.

Conducted a 2-hours training programme for the client’s employees on the fundamental concepts of noise and hearing conservation against workplace noise.

Completed

9.

STP Factory, LembahSubang, Selangor.

New Avant Engineering Sdn. Bhd.

Initial Noise Monitoring for the purpose of submission to JabatanKeselamatandanKesihatanPekerja, Malaysia, as required under the Factories and Machinery (Noise Exposure) Regulations, 1989.

Noise measurements include noise contour mapping, dosimeter reading from relevant factory workers exposed to excessive noise, identifying the action level (85dBA) and providing noise control measures where necessary.

Completed

Top