PROJECTS
Airports
| NO | PROJECT | CLIENT | SCOPE OF WORK | STATUS /COST |
|
1. |
BintuluAirport Project, Sarawak. |
SwissmaBuilding Technologies for Arkitek Visireka, Sarawak. |
Sound Insulation specification analysis recommendation for roof and wall building specifications. Sound Insulation design for the Main Terminal building, Control Tower, Metrological Station, Administration Block, etc. |
Completed Value: Undisclosed |
|
2. |
FLY FM National Live Broadcasting Radio Station, KLIASatelliteBuilding, Sepang. |
Max Airplay for TV3 and MAB. |
Sound Insulation, room acoustic and mechanical noise control design for the live broadcasting Radio Facility, designed for international standards. |
Completed Value: RM5, 000, 000 |
|
3. |
The Airport, Phnom Penh Cambodia |
Vinci-Muhibbah Joint Ventures |
Sound Insulation specification analysis recommendation for roof, wall and facade building specifications. Room acoustic and mechanical noise control design for theMain Terminal building, Administration Block, etc. |
On going |
|
4. |
The Airport, Seam Reap Cambodia |
Vinci-Muhibbah Joint Ventures |
Sound Insulation specification analysis recommendation for roof, wall and facade building specifications. Room acoustic and mechanical noise control design for the Main Terminal building, Administration Block, etc. |
On going |
































