PROJECTS
Factory Facilities
| NO | PROJECT | CLIENT | SCOPE OF WORK | STATUS /COST |
|
1. |
INTEL KM3 Building, Kulim, Kedah. |
BYG Architecture Sdn. Bhd. For INTEL Penang. |
Room acoustic, mechanical and vibration noise control analysis within the spaces. Particular design attention was placed to achieve a low ambient noise from the ACMV and high speech clarity within the Multipurpose Hall. |
Completed Value: RM120M |
|
2. |
INTEL PG2 Building, Penang. |
Success Constructions Sdn. Bhd. For INTEL Penang. |
Acoustic Product Performance Review and Performance Comparison. Acoustic material to be used in all the meeting rooms, conference rooms, etc. |
Completed Value: Undisclosed |
|
3. |
INTEL KM3 Façade STC and Rvalue Assessment. |
CMT (Penang) Sdn. Bhd. |
STC and R-value Assessment and R&D services. |
Completed Value: Undisclosed |
|
4. |
INTEL KM6 Building, Kulim, Kedah |
BYG Architecture Sdn. Bhd. For INTEL Penang. |
Room acoustic and mechanical noise control analysis and design for various spaces within the facility. Particular design attention was placed to achieve a low ambient noise from the ACMV and high speech clarity within the Multipurpose Hall. |
Completed Value: RM300M |
|
5. |
INTEL Saigon Hi Tech Park, Ho Chi Minh City , Vietnam. |
BYG Architecture Sdn. Bhd. For INTEL Vietnam. |
Room acoustic and mechanical noise control analysis and design for various spaces within the facility. Particular design attention was placed to achieve a low ambient noise from the ACMV and high speech clarity within the Multipurpose Hall. |
Completed Value: RM850M |
|
6. |
Seagate Factory Project. |
BlueScope Lysaght (M) Sdn. Bhd. |
Thermal Resistance Assessment and STC Assessment for Two Roof Systems. |
Completed Value: Undisclosed |
|
7. |
Compressor Noise (DOE) for Air LiquideMalaysia Sdn. Bhd. |
Air Liquide Malaysia Sdn. Bhd. |
Noise assessment for 3 units of air compressors located within the facility. Boundary noise control for DOE requirements. |
Completed Value: Undisclosed |
|
8. |
AMBU Factory, Bayan Lepas, Penang Facility Extension Project. |
BYG Architecture Sdn. Bhd. |
Room acoustic design for the entrance lobby atrium space, meeting room and training room. Mechanical and Vibration Noise Control analysis and treatment for all Production Areas. Particular design attention was placed to achieve the DOSH (JKKP) required low noise levels within the plant/production areas. |
Completed Value: Undisclosed |
|
9. |
Auditorium within the Zhulian Industries, Penang |
Imaging Space Design Sdn. Bhd. |
Acoustic treatment design for the Multipurpose hall. Particular design attention was placed to achieve good speech intelligibility within a sound reinforced environment and also without sound amplification, relying only on |
|
|
10. |
The Intel Building (PG7) in Penang |
Pen Konsult Sdn. Bhd. |
Room acoustic design for the entrance lobby atrium space, meeting room and training room. Mechanical and Vibration Noise Control analysis and treatment for all Production Areas. Particular design attention was placed to achieve the DOSH (JKKP) required low noise levels within the plant/production areas. |
|
|
11. |
Accelent Factory Bayan Lepas, Machine Floor Ambient Vibration Control |
Nakano Construction Sdn. Bhd. |
Vibration control design for the 1st floor factory floor, within a existing Factory Building surrounded by busy traffic and large adjacent factory lot/facilities |
Completed |