PROJECTS
Government Building
| NO | PROJECT | CLIENT | SCOPE OF WORK | STATUS /COST |
|
1. |
Palace Of Justice located in Putrajaya. |
Putrajaya Holdings Sdn. Bhd. for Mahkamah Persekutuan Malaysia. Project Managers: KLCC (Holdings) Bhd. |
Room acoustic, sound insulation, mechanical noise control and audio-visual design for Court Rooms, Auditorium and all supporting facilities. Particular design attention was placed to achieve good speech intelligibility within the Court Rooms using both natural acoustics and sound reinforcements. |
Completed Value: RM 960M |
|
2. |
TUDM Batu Tiga HQ Conferencing Room, Selangor. |
M.Idris Sdn Bhd for Tentera Udara Diraja Malaysia. |
Army aircraft and army helicopter External Noise Sound Intrusion Treatment for the Conferencing HQ facility. Architectural Acoustic Treatment for video and teleconferencing facility. Particular design attention was placed to achieve a low ambient noise suitable for conferencing use within the conferencing room. |
Completed Value: RM 100, 000.00 |
|
3. |
TUDM Butterworth, 160 Seats Auditorium. |
JKR TUDM for Tentera Udara Diraja Malaysia. |
Army aircraft and army helicopter External Noise Sound Intrusion Treatment for the Auditorium Facility. Architectural Acoustic Treatment for Auditorium Facility. Particular design attention was placed to achieve a low ambient noise suitable for speech use within the auditorium. |
Completed Value: RM 100, 000.00 |
|
4. |
Kajicuaca Office (Jabatan Meteorologi Malaysia) in TUDM, Butterworth, Penang. |
Cleanmaster Enterprise. |
Sound insulation and room acoustic system design for the BilikPengarahKajicuaca, BilikOperasiUtama and BilikMesyuarat/Taklimat in the Kajicuaca Office building. |
Completed Value: Undisclosed |
|
5. |
Lot 2G1 Precinct Two, located in Putrajaya. |
Nam Foong (M) Sdn. Bhd. for Sunway Engineering Sdn. Bhd. |
Mechanical noise control analysis, and design for the HVAC systems i.e. car park ventilation/smoke spills, AHU systems. Particular design attention was placed to achieve an acceptable noise criteria within the occupied areas. |
Completed Value: Undisclosed |
|
6. |
Customs, Imigration and Quaranteen Complex (CIQ), Johor Bahru, Johor. |
Kejuruteraan Bintai Kindenko Sdn. Bhd. for Man Fatt Engineering. |
Comprehensive Mechanical noise control analysis, and design for the ACMV systems for the entire building. Particular design attention was placed to achieve the JKR stipulated noise criteria within the contract documents applicable to all occupied areas. |
Completed Value: RM580M |
|
7. |
Bilik Gerakan within Wisma Darulaman, Kedah. |
Azam Hias Sdn. Bhd. |
Sound Insulation, room acoustic and mechanical noise control design for the BilikGerakan within the building of WismaDarulaman. Commissioning measurements for the studio reverberation time (RT60) and ambient noise levels. |
Completed |
|
8. |
Pre Tender Work - Penang International Exhibition and Convention Centre |
East Design Architect Sdn. Bhd. |
A comprehensive acoustic design brief to meet the Sound Insulation, Room Acoustics, Mechanical HVAC Noise Control and Vibration Control requirements through out the entire international commercial facility. |
|
|
9. |
MATRADE Exhibition Centre, Mukim Batu, Wilayah Persekutuan, Kuala Lumpur |
TTDI KL Metropolis Sdn. Bhd. |
A comprehensive acoustic treatment to meet the Sound Insulation, Room Acoustics, Mechanical HVAC Noise Control and Vibration Control requirements through out the entire international commercial facility. |
|
|
10. |
The design, build, equipping, T&C of InstitutKanser Negara (IKN), Putrajaya |
KiaraTeratai Sdn. Bhd. |
Sound Insulation, Room Acoustics, Mechanical ACMV Noise Control and Vibration Control design for the various facilities located within the building. |
On going Value: RM700M |
|
11. |
The New Media City, within the RTM facility. |
GDP Projects Sdn. Bhd. |
Design for 2 nos. of live broadcasting TV Studios, a News Studio, recording facilities, post-production suites, other production related spaces Special attention is also provided for the 3,000 seat line broadcasting auditorium. |
On-going Value: RM 680M |
































