PROJECTS
Utilities/Sub-Stations/Power Plants
| NO | PROJECT | CLIENT | SCOPE OF WORK | STATUS /COST |
|
1. |
TNB Sub-station at TamanMayang. Transformer Noise Problem. |
Tricomtech Sdn. Bhd. for TenagaNasionalBerhad (TNB). |
Airborne noise to boundary, external sound insulation and mechanical noise control. Sound insulation design for 3 nos.of 240 MVA TNB step-down transformers, to eliminate tonal hum and reduce boundary noise levels as required under DOE guidelines. |
Completed Value: RM0.5M |
|
2. |
GentingSanyen Brown Paper Mill Expansion Project, located on a 20-hectare land at Kuala Langat Power Plant. |
Edgewalks Sdn Bhd. for GentingSanyen Power Sdn Bhd. (Member of Genting Bhd Group). |
Conduct a detailed EIA (Environmental Impact Assessment) study for the proposed plant expansion, on the aspects of noise for submission to DOE and other related Government Authoriries. Recommend noise control for all major noise sources in the event of the boundary noise level exceeds 55 dbA - night-time levels. |
Completed Value: RM180M |